Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Nepal projects $4.78 billion needed for flood recovery as of recent assessment

    September 14, 2026

    On September 12, UAE and India strengthen economic and strategic collaborations during high-level talks

    September 14, 2026

    Dun & Bradstreet SAME Launches the Business Credibility Report as Credibility Emerges as the New Currency of Business Growth

    September 14, 2026
    Tunisian Star: Tunisia’s stories in global focus.Tunisian Star: Tunisia’s stories in global focus.
    • Automotive
    • Business
    • Editorial
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Tunisian Star: Tunisia’s stories in global focus.Tunisian Star: Tunisia’s stories in global focus.
    Home » Nepal projects $4.78 billion needed for flood recovery as of recent assessment
    News

    Nepal projects $4.78 billion needed for flood recovery as of recent assessment

    September 14, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    KATHMANDU, NEPAL / RankWire.AI / – Nepal has projected that restoring areas affected by the floods of August 26 along the Bhote Koshi will require approximately $4.78 billion. The government’s Rapid Damage and Needs Assessment estimates direct physical damages at around $1.8 billion, while economic losses are approximated at $883 million. This assessment encompasses social services, productive sectors, and key infrastructure. Floods impacted Rasuwa, Nuwakot, Dhading, and other regions along the river system, causing damage to residences, roads, bridges, and energy infrastructure.

    Nepal estimates $4.78 billion for flood reconstruction
    Flood recovery in Nepal centers on rebuilding homes, roads, bridges and energy systems. (AI-generated image)

    The government anticipates that immediate recovery and reconstruction efforts over the next six months will need about $57.67 million. The longer-term rebuilding efforts are projected to amount to roughly $4.71 billion of the total funding. Nepal’s Ministry of Foreign Affairs indicated that the rapid assessment has been shared with relevant agencies. A comprehensive Post Disaster Needs Assessment is still underway, aiming to offer a more detailed understanding of the losses and recovery requirements. Reconstruction activities are ongoing across transportation, energy, and telecommunication networks within flood-affected districts.

    Initial government data indicate widespread damage to communities and public infrastructure. Approximately 7,570 homes have been damaged, impacting about 32,933 individuals. Damage has also been recorded at 48 government offices. Floodwaters have destroyed around 55 kilometers of roads, 37 motorable bridges, and 68 suspension bridges. Agricultural land spanning 1,806 hectares has suffered losses. The energy sector has experienced significant disruptions, including damage to 13 hydropower projects, one solar plant, and two transmission lines.

    Flooding hampers transportation and power supplies

    Assessment reports from the government indicate that about 783 megawatts of hydropower capacity have been affected by the floods. Damaged roads and bridges have limited access to several communities. Efforts continue to clear routes and restore vital transportation links. One such improvement includes the installation of an Acrow bridge over the Tadi River at Devighat, now open for public use. Additionally, government teams are actively removing debris and reopening blocked roads. Nepal has utilized local resources and received international assistance to support emergency response and recovery activities.

    Search and rescue operations persist alongside infrastructure repairs. As of September 11, authorities had rescued 13,676 people, including more than 320 foreign nationals. Approximately 5,130 individuals remain listed as missing, with around 600 foreigners from 35 countries among them. Recovery teams have recovered 1,385 bodies. Officials caution that casualty and missing persons figures could fluctuate as identification efforts continue. Forensic specialists are assisting Nepal Police and other agencies through DNA collection, analysis, and the identification of recovered remains.

    Reconstruction estimate informs broader recovery efforts

    Debris removal has become a crucial component of the ongoing recovery process. The United Nations Development Programme estimated that at least 2.2 million tonnes of debris are present in the affected areas it evaluated. Its preliminary review revealed that 11 hydropower stations and one solar facility have ceased operations, with a combined capacity of 431.1 megawatts. The assessment also identified damage to 15 power projects under construction, which collectively had an expected capacity of 470 megawatts.

    While the $4.78 billion estimate remains Nepal’s primary official figure for reconstruction, the detailed national assessment is still ongoing. Authorities continue to conduct search operations, restore infrastructure, and provide relief to impacted communities. The government has also requested specialized equipment such as drones, bridge systems, testing kits, and pumping equipment to aid recovery. Officials assert that the comprehensive assessment will determine the full scope of damage, economic losses, and rebuilding needs following one of Nepal’s most severe recent flood crises.

    Related Posts

    On Sunday, UAE and Jordan Leaders Held Talks Focused on Trade and Regional Stability

    September 14, 2026

    UAE Germany talks expand trade and diplomatic ties

    September 11, 2026

    On September 10, UAE and Germany Enhance Diplomatic Relations During State Visit

    September 11, 2026

    On Wednesday, UAE President Sheikh Mohamed bin Zayed Al Nahyan Visits Germany to Strengthen Bilateral Relations

    September 10, 2026

    On March 12, Malaysia Declares Emergency in Sarawak Due to Severe Air Pollution from Haze

    September 7, 2026

    UAE Support Team Assists Nepal Flood Relief Efforts in Rasuwa as of September 2023

    September 7, 2026
    Latest News

    Nepal projects $4.78 billion needed for flood recovery as of recent assessment

    September 14, 2026

    Nepal has projected that restoring areas affected by the floods of August 26 along the Bhote Koshi will require approximately $4.78 billion. The government’s Rapid Damage and Needs Assessment estimates direct physical damages at around $1.8 billion, while economic losses are approximated at $883 million. This assessment encompasses social services, productive sectors, and key infrastructure. Floods impacted Rasuwa, Nuwakot, Dhading, and other regions along the river system, causing damage to residences, roads, bridges, and energy infrastructure.

    On September 12, UAE and India strengthen economic and strategic collaborations during high-level talks

    September 14, 2026

    On Sunday, UAE and Jordan Leaders Held Talks Focused on Trade and Regional Stability

    September 14, 2026

    Oman’s Inflation Rate Hits 3.4% in August Amid Rising Transport Costs

    September 14, 2026

    On April 2024, UAE President Engages with German Business Leaders to Strengthen Economic Relations

    September 12, 2026

    India and Russia boost non energy trade toward 100 billion goal

    September 12, 2026

    In 2024, UAE Announces €40 Billion Investment Commitment to Germany

    September 11, 2026

    In September, UAE and Germany Initiate Strategic Engagements and Investment Initiatives

    September 11, 2026
    © 2026 Tunisian Star | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.